- Senior Project Manager involvement during the final stages of the
Shurtan Gas-Chemical project in 2000 during the time with ABB Lummus Global. A
logistic challenge had been achieved by shipping a major part of the heavylift
equipment by Air from Japan to the Shurtan jobsite by use of 3 Antonov 124,
making it possible to finish the project’ challenging time schedule.
- Complex logistics solutions were
investigated and surveyed in 2001/2002 for the Kirishi
Hydrocracker Complex Project in Kirishi, Russia. The plant is owned by
Surgutneftegaz, with it’s subsidiary KINEF, also playing a key role in the
decision making process and is located approximately 150 km from St.
Petersburg. In a time span of 2,5 years some 250.000 tons is being moved.
Several solutions and scenarios have been designed and presented to the project
team as well as the principal to streamline the logistics.
- Involvement on senior logistic advisory in the
design and preparation of the logistics execution plan for Sakhalin I project
which ABB had been awarded in 2002 by Exxon Neftegas Limited, operator for the Sakhalin 1 Consortium, for the
engineering, procurement and construction of the Chayvo and Odoptu onshore
processing and well site support facilities for the Sakhalin 1 project in the
Russian Far East. Included in the logistics challenges were beach-landings.
- In the 25+ years of experience Peter has been involved in a great number of
FSU challenging projects consisting of project cargo and regular freight &
logistics and has visited the FSU on several occasions. He has been keeping a
close contact with vendors like Mammoet, ALE (Brambles), P&O Nedlloyd,
Baltic Forwarding Co.(St.Petersburg) etc.